Packaging Mold Component
Shenzhen Bofa Mould Co., Ltd. after years of technical development and practice accumulation, we have mastered the core technology of mold research and development, design, manufacturing, maintenance and injection molding, with strong research and development ability, complete technical reserve, and established a complete injection molding technology system.
- Fast Delievery
- Quality Assurance
- 24/7 Customer Service
Product Introduction
Shenzhen Bofa Mould Co., Ltd. after years of technical development and practice accumulation, we have mastered the core technology of mold research and development, design, manufacturing, maintenance and injection molding, with strong research and development ability, complete technical reserve, and established a complete injection molding technology system.
Mold product business has made progress in recent years. The development speed of large, fine, fine and long-life molds is much faster than the overall development speed of the industry. Die quality is closely related to life; Material is affect the service life of the mould, casting processing, relevant heat treatment, mold machining accuracy (contour accuracy, position accuracy, etc.), mold surface quality (including surface roughness, hardness, surface layer organization), one of the main factors which is one of the most key factor affected the accuracy of the mold, especially the precision of the mold assembly.
Perfect quality management and standardization of mold processing. Extensive processing, dedicated service to customers, aim at development, quality control of all workers, customer happiness.
FAQ:
1. Q: Does the company have its own factory?
A:Yes.
2. Q: How much do parts cost?
A: We will carefully review the drawings and requirements and provide competitive quotations based on customer requirements.
3. Q: How do I place an order?
A:(1) Please provide drawings or samples (non-standard items) or serial numbers (standard items).
If the documents are intellectual property and confidential, we can sign a confidentiality agreement.
(2) Evaluate drawings and requirements immediately. We will try to send the offer back to the client on the same day.
4. Q: Delivery time?
Generally, small and medium-sized molds need 30 ~ 35 days, especially large molds need 40 ~ 45 days.








